High-risk task notice
Items involving construction, safety, electrical, structural, fire, or gas work are high-risk. Online results serve only as design consultation or deepening reference. Before construction, a locally qualified professional must verify on site.
High-risk types and boundaries
High-risk types include: construction drawing deepening, MEP layout advice, electrical planning/panel risk consultation, and tasks involving load-bearing walls, gas, fire safety, or structural changes. Boundaries: 1. Online results serve only as design consultation or deepening reference and do not replace on-site verification or final construction judgment. 2. Taste contributors cannot take on high-risk types. 3. High-risk types must be handled by qualified professional providers and require on-site verification. 4. Panel-related consultation is uniformly expressed as "electrical planning/panel risk consultation" to emphasize its risk nature and on-site verification requirement.